Advantages
Installation
Specifications and Cost
Downloadable Brochure
Warranty Information



TiLux
Installation
Have a licensed electrician to do the installation for best results. There are three terminal ports on the
panel: green-ground; white-neutral; black-hot. The wiring that needs to be used is 14 guage or higher. It should be three wires that will have the same color combination of the terminal ports. Strip the wires and connect the corresponding colored wires to the corresponding colored ports. Click on the link below for the installation manual. We are not responsible for any defects or accidents if a licensed electrician is not used to install our products.

Installation Manual

 

8550 N. Silvery Lane, Suite 101 | Dearborn Heights, MI 48127
Copyright © 2008 midwestLED